October 2, 2011 2nd 詳細もできてきました
あれから・・・
September 16にスタジオの床も貼り始めてから、今度は本箱などの詳細部分も始まりました。
(October 2は、次ページに1stもあります。併せて読んでください!)
Then…
Since floor for the studio has getting ready on September 16, the details such as bookshelf is started to be built in.
(Along this page, please go back to the previous page since October 2 has two stories.)
September 16にスタジオの床も貼り始めてから、今度は本箱などの詳細部分も始まりました。
(October 2は、次ページに1stもあります。併せて読んでください!)
Then…
Since floor for the studio has getting ready on September 16, the details such as bookshelf is started to be built in.
(Along this page, please go back to the previous page since October 2 has two stories.)
by miwakoda | 2011-10-02 18:31 | スタジオ建築 Architecture